Our Services
Partner With Us
Our Clients
Download .PDF Forms
Employment
Local Links
Resources
Contact Us
Site Map
Home Page

T Fiore Recycling - Newark NJ Completed: 2011-01-11
delivering RCA to New Egypt NJ

A Cruz Trucking Inc. - Hauling Sand /NJ Completed: 2010-11-23
CET hauling sand for Cambridge Pavers Corp., Clayton Concrete, Sahara sand & gravel

East Bay Shopping Center - Toms River NJ Completed: 2010-11-16
Installation of eco style grates on all drainage system products though out the center.

Lor-Mar/Toto Inc. - Cranbury NJ Completed: 2010-11-15
Hauling of topsoil from Cranbury to Clayton NJ.

Walgreens - Jackson NJ Completed: 2010-10-11
Connection of the sanitary sewer to the city system and abandoment of the existing septic system which consisted of 2,500 gallon holding tank and 500 gallon dosing tank

Peguero Trucking - NJ Completed: 2010-10-01
CET hauling fill and sand through out NJ

Argos Farm - Lacey Twp. Completed: 2010-06-01
Excavate 2500CY. for new septic system with soil replacement. Install 1500 gallon holding tank, and supply 3/4 clean stone for leaching field

Forked River House /Parking Lot Improvements - Forked River NJ Completed: 2010-05-30
This was an Addition to an existing parking lot. The construction of this parking lot called for a retention basin to be constructed, there was over 3,000CY of earth material removed from the site. Swales and berms created along with K-5 material installed in the bottom of the basin. Over 500 tons of DGABC was used in the subbase of the parking lot.

Harmony Rd - Middletown NJ Completed: 2010-03-27
Rehablitation of existing retention basin, removal of wetex, regrade slopes and install K-4 sand in bottom of retention basin.

Jackson Shoprite - Jackson NJ Completed: 2010-03-24
Installation of 6" bollards for protection of electric transformers.

Stafford Square - Stafford Twp,NJ Completed: 2010-03-10
Replacement of fire hydrant,curbing and paving. Locate and clean all valve boxes through out Center.

Lacey Mall - Lanoka Harbor Completed: 2010-03-08
Watermain Repair, locate and excavate watermain break install repair collar and pave area.

Middletown Crossings - Middletown NJ Completed: 2010-02-28
Equipment rental consisted of Excavator, Dozer and dirt roller also imported over 3,000 cubic yards structual fill.

Taco Bell - Mays Landing, NJ Completed: 2010-01-23
Site Prepation, removal of existing asphalt parking lot along with curb removal. Earthwork, excavate and import fill to construct building pad and new parking lot. Utility Construction, Install six inch fire sevice with hydrant and supply a 2" domestic service to the building.The sanitary sewer included a connection to the existing Manhole and also supplied a 500 gallon grease collection pit.The drainage system consisted of 5 catch basins with 24" ADS pipe.Concrete, there was over 3,000 feet of curb installed and 2,400 square feet of sidewalk installed. Paving, the parking lot for Taco Bell took over 5,000 square yards of asphalt

Bacorp Inc - Forked River NJ Completed: 2009-12-08
Residential lot, scope of work was to raise lot to building pad grade using 100 cubic yards of import fill. Then installing ADS drainage lines from the building pad to the bulkhead and connection of the water and sewer connections which required dewatering.

Briar Hill - Holmdel, NJ Completed: 2009-09-25
The installation of a 2,500 sq. ft. allen block wall, clearing of a 1/2 acre, the installation of dry wells to accomadate rain water runoff,installation of 2,300 square feet of pavers, excavation and grading of 1,100 cubic yards of fill material and topsoil.

Lawrence Realty - Lawrenceville, NJ Completed: 2009-05-10
Installation of two one inch domestic water lines, one supplying AT&T store and the other supplying Casual Male. scope of work also included paving of the water line trench.

TJ Maxx - Lanoka Harbor, NJ Completed: 2009-03-28
Tap existing water and sanitary sewer mains to provide new 4" sanitary line and new 1 1/2" water line to building. Remove existing 6" concrete pad and pour new dumpster pad 6" thick for a total of 400 sq. ft. Build two sets of stairs for new doorways and pave all areas.

Lowes Home Improvements - Stafford Twp. NJ Completed: 2007-03-20
Demolition of existing sewer, electric, storm and curb totaling over 13,000 linear feet..Installation of new pavement added up to 37,332 square yards, the Removal of a 95,000 square foot block building was taken down, the Earthwork included the delivery of a 120,000 square foot pad for Lowes, while the cuts and fills exceeded 18,000 cubic yards. Concrete curb installation was over 10,000 linear feet, the installation of a water system which included pipe sizes from 6" to 12" ductile iron pipe totaling over 4,000 linear feet,There was 569 feet of sanitary sewer on the project the reconnection of four stores and two new manholes installed. Pipe sizes ranged from 10" to 48" HDPE with a total of 4652 feet being installed and 32 new catch basins installed, while 8 catch basins where re-fitted.

Mill Creek Crossings - Manahwkin NJ Completed: 0000-00-00
This commercial project has a variety of items in its scope of work. Installation of K-5 sand in the drainage basin, Subgrading of parking of parking lot and installation DGABC, Base coat of paving, Topsoil and seed to stabilize areas. Watermain installation, shut down 12" watermain to remove old valve and install new 4" gate valve and new 2" valve, then extend 4" fire line and 2" domestic line across county road to building site. Road widening, install county curb and widen road 7 feet.